Provide the pure drinking Gwadar water to people

“It’s no longer a dream. It’s a reality,” said the deputy director. Supply to Gwadar City. City planner Jawad Abdul Razzaq said in an interview with Jawad Pro Confirming the details. he said 67 km of Gwadar water transport pipeline  laid. from Sawad Dam to Gwadar . and 5 million gallons of pure drinking water per day laid at a cost of his Rs. 3.8 billion.

Broken water grid 

About 90% of the work will done at the Chaud Daggar dam. and 2.5 MGD of safe drinking water can provided to Chaud Daggar at a cost of Rs.

he said Earning 3.5 billion. that the remaining work will likely completed next year. He revealed the Ankara Dam. which built many years ago. and has a capacity of 2.7 million gallons per day, connected to both dams..For sewage-contaminated Gwadar water in cracked drinking water supply lines connected to homes. he replaced the old rusty. and broken water grid with a highly insulated modern water grid. the line. The cost of this project is Rs. He confirmed that the $3.5 billion will completed next year. Zhang Baozhong, chairman of China Overseas Port Holding Company (COPHC). said China provided about his Rs as an emergency to understand. 

Chinese subsidy to provide drinking water.

the seriousness of water problems for local residents in Gwadar. He provided $2 billion as a special grant to the government to start a 1.2 million gallon. per day desalination plant. A GDA official said. the government has agreed to build a 1.2 MGD desalination plant in Gwadar. with the help of a Chinese subsidy to provide drinking water. to people in the city of Gwadar. rice field. Currently, along with PC-1. he is building a 1.2 MGD reverse osmosis desalination plant. with associated infrastructure approved by the CDWP. Meanwhile, under CPEC. the Central Development Working Group (CDWP) has approved PC-I to install a 5 MGD RO plant at a cost.

 Gwadar’s water demand exceeds.

Gwadar is currently supplied with only 2 million gallons of water per day. through an old dam and a series of mobile water tanks. Today, Gwadar’s water demand exceeds 5 million gallons per day.  an all new water management system will be operational next year. and will include excess water as. it designed with Gwadar’s future water demands in mind. GPA Chairman Nasir Ahmed Kashani said. that providing clean water for the people. of Gwadar was the main focus of Prime Minister Imran Khan adding. that 1.2 MIGD. and 5 mgs of the salinization plant are part of South Baluchistan’s PM package. said to be part. Non-operational next year. There is surplus water as it designed with Gwadar’s future water demands in mind.

Gwadar’s nightmare of water scarcity.

Gwadar Pro reported Wednesday. that Gwadar’s nightmare of water scarcity. and pollution will end next year. as the coastal city’s app. .168,000 inhabitants will be supplied with clean drinking   PM package. said to be part. Gwadar Pro reported Wednesday. that Gwadar’s nightmare of water scarcity, scarcity. and pollution will end next year. as the coastal city’s approximately 168,000. inhabitants will supplied with clean drinking water. This means that in 2022. he will work on several water supply systems. including water distribution systems from three dams. replacement of rusted and damaged water lines connected to each household. and a desalination plant led by the Baluchistan government. and the Gwadar Development Authority. It will realized after the implementation of the management project.

 Pure potable water to Gwadar.

In the stalemate, as usual. China has also stepped forward to play its role in alleviating. the water problem by offering. He invested $2 billion in a desalination plant. under the supervision of the Gwadar Port Authority (GPA). supply of Gwadar City.

A 67 km water pipeline has laid from the Sawad Dam with 5 million gallons per day. (MGD) of pure potable water to Gwadar at a cost of Rs. 3.8 billion. Its about 90% of the work has done on the Chaud Daggar dam. and 2.5 MGD of safe drinking water can provided to Chaud Daggar at a cost of Rs. They added that the remaining work will likely completed next year.

Ankara Dam built.

He revealed the Ankara Dam. which built many years ago. and has a capacity of 2.7 million gallons per day. connected to both dams. This will ensure a continuous supply of Gwadar residents. especially those living in the Old Town. For water contaminated by sewage in cracked drinking water. supply lines connected to homes. he replaced the old, rusted and broken water line network. with a modern one. highly insulated. modern water supply. said to do. Line.

Also read: Gwadar today

Leave a Reply

Your email address will not be published.